|
Cityview Corporate Center
160 Chubb Avenue, Lyndhurst, NJ
|
| Type: |
Class "A" Office Building |
| Building Size: |
135,365 Rentable Square Feet |
| Floor Size: |
3 Floors of 46,100 Rentable Square Feet
|
| Year Built: |
Originally 1977, Completely Rebuilt 2001 |
| Ownership: |
Kwartler Associates, Inc. |
| Parking: |
547 spaces (includes 10 handicapped spaces) |
| Building Exterior: |
Anodized Aluminum Panels and Reflective Glass Curtain Wall |
| Roof: |
A new, fully warranted mechanically fastened EPDM roof |
| Access Control System: |
Computer monitored card access system |
| Structural: |
The building is constructed over a 3-Story structural steel frame. The structural bays are 25-feet x 30-feet. The floor construction is 3-1/2" metal deck |
| Live Floor Load: |
100 lb. PSF- second and third floors |
| Ceiling Heights/Mullion Spacing: |
9' Finished Ceiling Heights; 5' Mullion Spacing |
| Elevator: |
Two (2) Passenger with 2,500 lb. capacity One (1) Freight wit 3,500 lb. capacity
|
| Power/Telecommunications: |
The building is serviced by 277/480 volt, 3 Phase, 4 wire, 2,500 amp service with a pad mounted PSE&G transformer
The service is capable of satisfying the following building load requirements:
· Building HVAC systems
· Building Common Area power & lighting
· Building site lighting
· Tenant area general power and lighting at 6.5 watts/square foot (total connected load)
The building is provided with a utility electric meter. The tenant power is monitored either by sub-meter or survey for all tenant power, lighting loads and special cooling loads
|
| HVAC: |
The building HVAC will include six (6) new package cooling systems to allow maximum flexibility and economical after-hours service.
The air will be distributed through a variable air volume system located, as required, throughout the tenant spaces.
The heating plant consists of gas-fired boilers, distributing hot water to the perimeter VAV Terminals and supplemental cabinet heaters at the entranceways and within the third floor ceiling plenum.
|
| Automatic Fire Suppression System: |
The building common areas are fully Sprinklered and tenant space will be as required in accordance with all codes, including NFPA
|
| Fire Protection: |
A fire alarm system for the buildings common areas is installed in accordance with all current applicable building codes including NFPA and ADA
|
| Emergency Lighting & Exit Lights: |
Emergency lighting and exit lights for the Building common areas are installed in accordance with all current applicable building codes including NFPA and ADA
|
| Energy Generators/UPS: |
An emergency generator provides back-up power for building life safety systems, building lighting for emergency egress and tenant emergency lighting.
A dedicated tenant distribution switchboard capable of providing for a total connected load of 6.5 watts/useable square foot for tenants' lighting and power is provided in the 1st floor main electric room.
|
| Highway Access: |
· 5 Miles to the Lincoln Tunnel and Garden State Parkway
· 1.25 miles to the New Jersey Turnpike
· .8 Miles to Routes 3 and 17
· 13 Miles to the Holland Tunnel
|
| Public Transportation: |
· NJ Transit Bus #192 to NY/PA
· NJ Transit Rail #76 Lyndhurst Station to Hoboken
· Shuttle Service to building from Lyndhurst Station
|
| Airports: |
· 13.2 miles to Newark International Airport
· 4.9 miles to Teterboro Airport
|
| Fiber Optic Capability: |
Fiber Optic service is available in the building. Multiple conduits, from several providers, are available in the street.
|
| Café: |
Cityview Cafe provides gourmet catering services and after hours vending.
|
| Area Amenities: |
Close proximity to child care, health club And several restaurants. The Marriot Courtyard, Renaissance Meadowlands Hotel, & Sheraton Hotels are minutes away and offer shuttle-service to the building.
|